Back to reform areas
Last checked initial load

Reform area

Water production by Renewable Energy - Invest in solar power

Status · Progress

Not reported

Thematic area

Enhanced Public Sector Performance

Enhanced Public Sector Performance

Justification

Justification

The power to the water treatments plants is supplied by ESCOM. However, the supply has been intermittent and costly (34% of operational cost for LWB is power). The solar power investment would reduce energy costs and increase potential for infrastructure investment.

Expected outcomes

Expected outcomes

  1. 1

    Continuity of water supply

  2. 2

    Increased access to water supply

Progress over time

Approved progress chart

Published progress values across approved reporting periods. Every value uses the same 0–100% scale.

Historical trend not available

PSRIMS has not yet published source-backed historical values for this chart.

Related approved reports

0 reports

No related approved reports have been published for this reform area.